Case Study: How a Gold Mine Increased Recovery by 8% with Optimized Crushing Circuit
Project Background
Location: Tanzania, East Africa Ore Type: Quartz-vein hosted gold, 4.2 g/t Au average grade Feed Hardness: UCS 220–280 MPa (very hard) Original Circuit: Single-stage jaw crusher feeding SAG mill directly Challenge: Inconsistent SAG mill feed size causing throughput fluctuations and suboptimal gold recovery
The Problem
The existing single-stage jaw crusher produced a wide product size distribution (P80 ~180mm with 25% +200mm oversize). The SAG mill struggled with:
- Frequent overload trips (3–4 per week)
- High ball consumption (0.85 kg/ton, 40% above benchmark)
- Low gold recovery in subsequent CIL circuit (78% vs 85% design target)
- Excessive liner wear due to direct impact of large rocks
💡 This is a common problem—single-stage crushing cannot achieve the consistent fine feed that SAG mills need. Our crushing plant design guide explains when multi-stage circuits are essential.
Omnimech Solution
Omnimech designed and supplied a three-stage crushing circuit:
Stage 1: Primary Jaw Crusher
- Model: PE-750×1060 jaw crusher
- Feed size: 0–630mm (ROM)
- Product: P80 ~120mm
- Capacity: 160 t/h
Stage 2: Secondary Cone Crusher
- Model: PYB-1750 standard cone crusher
- Feed: P80 120mm
- Product: P80 ~35mm
- Closed circuit with 50mm aperture vibrating screen
Stage 3: Tertiary Cone Crusher
- Model: PYD-1750 short-head cone crusher
- Feed: P80 35mm
- Product: P80 ~12mm
- Closed circuit with 16mm aperture screen
Supporting Equipment
- 2× ZSW-490×110 vibrating feeders
- 3× 2YK-2160 double-deck vibrating screens
- 5× belt conveyors (B800–B1000, total 320m)
- Central PLC control system with interlocking and remote monitoring
Implementation
Mobilization began in January 2024, with equipment delivered to site in 10 weeks. Key implementation details:
- Pre-assembled modules reduced on-site installation time to 6 weeks
- Omnimech commissioning engineers completed cold and hot commissioning in 10 days
- Operator training conducted in English and Swahili
- First ore crushed through the new circuit on March 28, 2024
Results (6-Month Performance Data)
| KPI | Before | After | Improvement |
|---|---|---|---|
| SAG mill feed P80 | 180mm | 12mm | 93% finer |
| SAG mill throughput | 108 t/h | 142 t/h | +31% |
| SAG mill ball consumption | 0.85 kg/t | 0.48 kg/t | -44% |
| SAG mill power draw | 1,250 kW avg | 1,180 kW avg | -5.6% |
| Gold recovery (CIL) | 78.2% | 86.4% | +8.2 percentage points |
| Total crushing energy | — | 1.95 kWh/t | — |
| Total OPEX (crushing + grinding) | $6.85/t | $5.34/t | -22% |
Key Success Factors
- Feed size consistency: The three-stage circuit delivered consistent P80 12mm feed, eliminating SAG mill overloads
- Liberation improvement: Finer crushing liberated more gold particles, dramatically improving CIL recovery
- Operator training: Comprehensive training ensured smooth transition and ongoing optimization
- Remote monitoring: Omnimech IoT system enabled remote troubleshooting from our China technical center
Client Testimonial
“The Omnimech crushing circuit has transformed our operation. Our gold recovery jumped from 78% to over 86%—that’s an additional 640 ounces of gold per month at current throughput. The project paid for itself in under 5 months.”
— Plant Manager, Tanzania Gold Mine
Financial Impact
- Additional gold production: ~640 oz/month × $1,950/oz = $1.25M/month incremental revenue
- Operating cost savings: $1.51/ton × 142 t/h × 6,000 h/year = $1.29M/year
- Project payback period: 4.7 months
- 5-year NPV (8% discount): $5.8M
Lessons for Other Operations
- Crushing circuit optimization yields compounding benefits downstream (grinding + recovery)
- Three-stage crushing pays for itself in <12 months for hard rock gold operations
- IoT-based remote monitoring enables rapid response to operating issues in remote locations
- Investing in operator training is as important as investing in equipment
Related Reading
- Crushing Plant Design Guide — How to design multi-stage circuits for hard rock
- Crushing Efficiency Tips — Strategies that contributed to the 22% OPEX reduction
- Ball Mill Selection Guide — Optimizing the grinding circuit downstream of crushing
- Cone Crusher Troubleshooting — Keeping the secondary and tertiary cone crushers running
- How to Reduce Crusher Downtime — RCM strategies for continuous operation
Contact Omnimech to discuss how we can optimize your gold mine’s crushing and grinding circuit.