Project Background

Location: Tanzania, East Africa Ore Type: Quartz-vein hosted gold, 4.2 g/t Au average grade Feed Hardness: UCS 220–280 MPa (very hard) Original Circuit: Single-stage jaw crusher feeding SAG mill directly Challenge: Inconsistent SAG mill feed size causing throughput fluctuations and suboptimal gold recovery

The Problem

The existing single-stage jaw crusher produced a wide product size distribution (P80 ~180mm with 25% +200mm oversize). The SAG mill struggled with:

  • Frequent overload trips (3–4 per week)
  • High ball consumption (0.85 kg/ton, 40% above benchmark)
  • Low gold recovery in subsequent CIL circuit (78% vs 85% design target)
  • Excessive liner wear due to direct impact of large rocks

💡 This is a common problem—single-stage crushing cannot achieve the consistent fine feed that SAG mills need. Our crushing plant design guide explains when multi-stage circuits are essential.

Omnimech Solution

Omnimech designed and supplied a three-stage crushing circuit:

Stage 1: Primary Jaw Crusher

  • Model: PE-750×1060 jaw crusher
  • Feed size: 0–630mm (ROM)
  • Product: P80 ~120mm
  • Capacity: 160 t/h

Stage 2: Secondary Cone Crusher

  • Model: PYB-1750 standard cone crusher
  • Feed: P80 120mm
  • Product: P80 ~35mm
  • Closed circuit with 50mm aperture vibrating screen

Stage 3: Tertiary Cone Crusher

  • Model: PYD-1750 short-head cone crusher
  • Feed: P80 35mm
  • Product: P80 ~12mm
  • Closed circuit with 16mm aperture screen

Supporting Equipment

  • 2× ZSW-490×110 vibrating feeders
  • 3× 2YK-2160 double-deck vibrating screens
  • 5× belt conveyors (B800–B1000, total 320m)
  • Central PLC control system with interlocking and remote monitoring

Implementation

Mobilization began in January 2024, with equipment delivered to site in 10 weeks. Key implementation details:

  • Pre-assembled modules reduced on-site installation time to 6 weeks
  • Omnimech commissioning engineers completed cold and hot commissioning in 10 days
  • Operator training conducted in English and Swahili
  • First ore crushed through the new circuit on March 28, 2024

Results (6-Month Performance Data)

KPIBeforeAfterImprovement
SAG mill feed P80180mm12mm93% finer
SAG mill throughput108 t/h142 t/h+31%
SAG mill ball consumption0.85 kg/t0.48 kg/t-44%
SAG mill power draw1,250 kW avg1,180 kW avg-5.6%
Gold recovery (CIL)78.2%86.4%+8.2 percentage points
Total crushing energy—1.95 kWh/t—
Total OPEX (crushing + grinding)$6.85/t$5.34/t-22%

Key Success Factors

  1. Feed size consistency: The three-stage circuit delivered consistent P80 12mm feed, eliminating SAG mill overloads
  2. Liberation improvement: Finer crushing liberated more gold particles, dramatically improving CIL recovery
  3. Operator training: Comprehensive training ensured smooth transition and ongoing optimization
  4. Remote monitoring: Omnimech IoT system enabled remote troubleshooting from our China technical center

Client Testimonial

“The Omnimech crushing circuit has transformed our operation. Our gold recovery jumped from 78% to over 86%—that’s an additional 640 ounces of gold per month at current throughput. The project paid for itself in under 5 months.”
— Plant Manager, Tanzania Gold Mine

Financial Impact

  • Additional gold production: ~640 oz/month × $1,950/oz = $1.25M/month incremental revenue
  • Operating cost savings: $1.51/ton × 142 t/h × 6,000 h/year = $1.29M/year
  • Project payback period: 4.7 months
  • 5-year NPV (8% discount): $5.8M

Lessons for Other Operations

  • Crushing circuit optimization yields compounding benefits downstream (grinding + recovery)
  • Three-stage crushing pays for itself in <12 months for hard rock gold operations
  • IoT-based remote monitoring enables rapid response to operating issues in remote locations
  • Investing in operator training is as important as investing in equipment

Contact Omnimech to discuss how we can optimize your gold mine’s crushing and grinding circuit.

Inquiry Form

Fill out the form below and we will respond within 24 hours with a competitive quote.

Submit Inquiry